Project:
The Development and Modernization of the Security Equipment at Žilina Airport – part 1.

Update:
In October 2007 the walk-through scanners (PMD 3) together with the baggage scanners (HS 100100T-2is and HS 7555i ) and the handheld metal detectors (PD 140 VR) have been integrated into airport security screening system. At the same time the operational devices, the scales, the conveyer system and the computerized control desks have been installed as well. The new closed circuit camera system consisting of 20 static cameras, one rotating camera and two digital recorders have been used as part of the surveillance system.

Project:
The Development and Modernization of the Airport Security System (fencing around the area) – part 2.

Update:
2 700 metres of fencing was done on the south side of the airport’s area by the 15th of April 2008. The end parts and entrance for agriculturalists and land owners has been secured by surveillance cameras. Final inspection of the system took place on May 15th, 2008.

Project:
The reconstruction of lights and power engineering for the direction of a runway 06 the Airport Žilina.

Update:
Up to the 13.11.2008 there was the reconstruction of a light safety appliance and power engineering for the direction of a runway 06. The reconstruction included the construction of a new transformer station TS 386 including 22 kW VN connector, the construction of a footbridge over the river Váh and construction adaptations for the setting up of signals.